The Future Growth Project (FGP) / Wellhead Pressure Management Project (WPMP) (Overall “Project”) is an expansion of Company’s existing facilities located in Tengiz, at Western Kazakhstan. The FGP/WPMP will add further processing, production gathering and sour gas re-injection capacity and increase production by 12 MMTPY. In addition, the FGP/WPMP will provide the means to accommodate a planned reduction in wellhead flowing pressure and thereby aid recovery of reserves.
The FGP/WPMP project is applying a modular construction design with Pre-assembled (Process and Utility) Units, namely the PAUs, and Pre-assembled (Pipe) Racks, namely the PARs, which are collectively referred to as Modules. The Modules are to be fabricated and tested outside the Area of Operations and transported to Tengiz in the Area of Operations for their final installation and Hook-up.
The Scope of Work 3GP PAR Installation onshore project comprises the receipt, installation and mechanical integration of the 3GP PARs. There are 44 PARs to be installed at 3GP.